|
Aghajari Gas Injection Project is the world’s biggest Enhanced Oil Recovery (EOR) project to be inaugurated in Iran in late 2008. The reservoir dimension of Aghajari fields is 56×6 km with the original oil-in-place of and 10.2 billion barrels of recoverable oil (based on latest studies). The total quantities extracted since the start of operations at Aghajari till this date have been 8.8 bn barrels.〔(PEDEC Website )〕 However, production has been on the decline because of loss of pressure and oil extraction, so that current output is a day. With injection of of gas per day ( of gas in tolal) from the south pars field and subsequent buildup of pressure, an additional quantity of of oil will be produced. It is also estimated that daily crude oil output of the field will increase to .〔 Project consists of three main parts; *Upstream: Development of South Pars phases 6, 7 and 8. *Midstream: The 504-km long, 56-inch pipeline for transfer of sour gas from the South Pars gas field phases 6,7 and 8 to be injected to Aghajari oilfield. *Downstream: Installation of a gas-compression station, drilling of 19 new wells, work over of 3 existing wells for gas injection, installing pipelines on 2 existing gas injecting wells.〔 ==See also== *World Largest Gas Fields *National Iranian Gas Company *NIOC Recent Discoveries *Iran Natural Gas Reserves *South Pars *North Pars *Kish Gas Field *Golshan Gas Field *Ferdowsi Gas Field *Persian LNG *Iran Gas Trunkline (IGAT) 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Aghajari Gas Injection Project」の詳細全文を読む スポンサード リンク
|